Interior Painting Services

“We make sure that your wooden furniture and objects are given special care to keep their beauty intact for years.”

  • Fresh Painting
  • Re-Painting
  • Rental Painting
pink paint wave

Time: 2 days!

Fresh Painting Process

Fresh painting means the walls are going to be painted for the first time. For such walls, there is an elaborate process. Often, when you buy a newly constructed apartment, the builders handover the flat where they have applied POP and distemper on the wall. Such walls need to be prepared for the painting.

painting process 1

Covering Up

Before we start, we ensure the household things are not stained by paint. We do this by masking the goods with some masking material.​
painting process 2

Two Coats Of Putty

Walls are prepared by applying two coats of cement putty. We start with cleaning and sanding of the wall. This is followed by application of putty on all walls. Once they dry, a second coat of putty is applied. We complete this step in one day!
painting process 3

One Coat Of Primer

Next day the walls are again sanded and thoroughly cleaned. After that we apply one coat of water based primer and let it dry.
painting process 4

Two Coats Of Paint

The walls are applied with two coats of top coat paint with adequate drying time between coats.
painting process 5

Clean Up

We clean-up to ensure all the dust and paint that has fallen on floor or doors/ windows are cleaned and restored. Step 3 to 5 are completed in 1 day.
pink brush on paint

Time: 1 day!

Re-Painting Process

Re-painting means the walls were previously painted but now need a new coat of paint. In this, walls are generally not required to be re-prepared unless the walls are chipping off, cracking, or have loose particles all over. Cement putty has a life of 5-7 years. After that it is recommended to have putty applied again. However, if putty is not damaged, then fresh putty application is not recommended during painting. Minor touch up is done before painting.

painting process 1

Covering Up

We ensure that there are no stains of paint on your articles and furniture by covering them up. We use masking material to ensure the same.
painting process 2

Cleaning/Touch Up Putty

Any loose particles are cleaned from walls followed by touching up minor defects on wall before painting. We use cement putty or any other method that may be necessary.
painting process 3

One Coat Of Primer

Next step is application of primer on wall. We apply one coat of water based primer and let it dry.
painting process 4

Two Coats Of Paint

After the primer application, the walls are applied with two coats of top coat paint with adequate drying time between coats.
painting process 5

Clean Up

All the dust and paint that has fallen on floor or doors/ windows are cleaned and restored. Step 1 to 5 are completed in 1 day.
paint image

Time: 1 day!

Rental Painting Process

Rental painting is meant for flat owners who will rent out their flats. Since, owners are not staying and occupants of the flat keep changing, it makes sense to opt for basic level of painting instead of spending money on high end paint.

painting process 1

Covering Up

We mask all the articles and furniture so that they are safe from dust and paint.
painting process 2

Cleaning/Touch Up Putty

Walls are cleaned followed by touching up minor defects on wall before painting. We use cement putty or any other product that may be necessary.
painting process 3

Two Coats Of Paint

In rental painting we do away with primer application and instead go directly with top coat application. The walls are applied with two coats of top coat paint with adequate drying time between coats.
painting process 4

Clean Up

House is throughly cleaned and all furniture and articles are unmasked.